Site
- Grass Root Refinery Tuban
- PT Pertamina Rosneft Pengolahan dan Petrokimia
- Refining and Chemicals Operations
- 62352
- Jawa Timur
- 5XH9+W3C, Bogang, Wadung, Kec. Jenu
-
Turban GRR Project Phase
The GRR Tuban project phase by PRPP has been started since 2016 which was marked by Bankable Feasibility Study activities. In 2019, PRPP collaborated with Tecnicas Reunidas S.A (Tecnicas Reunidas) as a GED drafting contractor based in Madrid, Spain to start the General Engineering Design phase for PRPP.
GED work consists of 2 (two) stages, namely Basic Engineering Design (BED) and Front End Engineering Design (FEED). The BED phase was completed on March 31, 2021 and immediately continued with the FEED stage which ended on May 31, 2022.
- 2016 - 2017: Bankable Feasibility Study
- 2019 - 2024: Development Phase
- 2024-2028: Engineering, Procurement and Construction
- 2028: On Stream
Petrochemical Products of GRR Tuban
Grass Root Refinery Tuban (GRR) is a modern fuel refinery:
- processing up to 300,000 barrels of crude oil per day.
- produce up to 10,921,000 tonnes of fuel annually
- produce up to 5,060,000 tonnes of petrochemical products and other petrochemical derivatives annually.
Refinery products
- Gasoline RON 95
- Gasoline RON 98
- Jet A1 (Avtur)
- Diesel
- Sulphur
- Methyl ter-Butyl Ether (MTBE)
Petrochemicals
- HDPE:
- LLDPE
- Polypropylene
- Mono Ethylene Glycol
- Paraxylene
- MTBE
- Styrene
- MEG
- Liquid Sulfur
TOTAL
390,000
260,000
1,160,000
500,000
1,367,000
437,000
510,000
500,000
436,000
5,060,000Downstream Applications
Site Master Settings
- Status
- A
- V
- P
- UoM
- Metric Ton
System Info
- Modified by
-  Kokel, Nicolas
- Modified
- 2/1/2025 9:27 AM
- Added by
-  Kokel, Nicolas
- Added
- 2/1/2025 8:43 AM
No Services yet available.
Enquire in Solutions how we can help you.
Please create Assets first to manage the Mass Balance Processes