Announcement of the new 250,000 tons/year C4 to 1-butene project in Baofeng, Inner Mongolia
May 14, 2025 -- The first, second and third series of the coal-to-olefin demonstration project of Inner Mongolia Baofeng Coal-based
New Materials Co., Ltd. were officially put into commissioning in November 2024, January 2025 and March 2025
respectively

4,000-ton aerospace furnace helps build the largest coal-to-olefins project
Feb 19, 2024 -- it adopts 11 4,000-tonne, water-cooled aerospace furnaces, arranged in 3 series, and equipped with 6.5MPa high-pressure pulverized coal transportation.

Note: we assume Series #1 and #2 each have 4 furnaces and Series #3 has 3 furnaces. 

Asset Info

Category
Processing
Status
A
V
Technology-Icon
Technology

Technology
CECO HT-L
Licensor
Changzheng Engineering Technology Co., Ltd.
Scenario-Icon
Scenario

Scenario
System / Public
Additional Info

Utilization Planning
Asset Level
UoM
Metric Ton
Startup Date
11/2024
System Settings

User
UserPic  Kokel, Nicolas
Modified
9/1/2025 8:10 AM
Added
8/29/2025 4:45 PM
  Units
Unit D Technology-Unit Category
Default Unit