Technology Unit
- Bagging/Baling Station (46)
- ExxonMobil Solution Process
- Short Name
- Bagging/Baling Station (46)
- Description
-
At the end of the horizontal devolatilizer chamber the concentrated polymer phase flows into a shaft provided with a screw impellor which drives the polymer
along the shaft and into an underwater pelletizer, fed with water chilled at (42). The polymer pellets are washed and spun dried at (44) to form pellets suitable for
bagging or baling at (46). - Link
System Info
- Updated by
-  Kokel, Nicolas
- Added
- 5/28/2023 3:12 AM