Tokuyama Complex|Manufacturing flow
Tokuyama Refinery (now Tokuyama Complex) started operations in 1957 (Showa 32) as Idemitsu's first Refinery. In addition, in 1964 (Showa 39), the Idemitsu Petrochemical Tokuyama Plant (currently Idemitsu Kosan Tokuyama Complex) was completed adjacent to Refinery, and it began supplying ethylene to Shunan Complex companies. At the end of March 2014, crude oil processing function was suspended in accordance with the Act on the Advancement of Energy Supply Structure, and now it functions as a logistics base for petroleum products to ensure a stable supply of crude oil as a production base for petrochemicals and a supply of raw materials to the Shunan Complex. Furthermore, technologies are developed with the aim of making a petrochemical complex with the highest level of competitiveness in Asia.
Main processing equipment
Naphtha hydrodesulfurization equipment |
1 unit | 22,000 barrels/day |
---|---|---|
Catalytic reformer |
1 unit | 22,000 barrels/day |
MEK equipment |
1 unit | 40,000t/year |
Ethylene production equipment | 623,000t/year | |
---|---|---|
Aromatic production quipment |
Benzene | 159,000t/year |
toluene | 130,000t/year | |
paraxylene | 214,000t/year | |
Styrene monomer roduction equipment |
340,000t/year | |
Cyclohexane production equipment |
125,000t/year | |
IP SOLVENT Manufacturing Equipment |
20,000t/year | |
Liquid rubber manufacturing equipment |
3,000t/year |
Utility equipment
steam equipment |
West district | 1 unit | 98t/hour | |
---|---|---|---|---|
East district | 5 units | 480t/hour | ||
Private power generation equipment |
West district | 1 unit | 26,250kWh | |
East district | 3 units | 45,000kWh | ||
Water equipment |
industrial water |
West district | 700t/hour | |
East district | 1,650t/hour | |||
sea water |
West district | 37,000t/hour | ||
East district | 53,000t/hour |
Environmental protection equipment
Activated carbon water treatment facility |
West district |
1920t/day | 80t/hour |
---|---|---|---|
East district |
3200t/day | 133t/hour | |
Oura | 840t/day | 35t/hour | |
Activated sludge water reatment facility |
East district |
3600t/day | 150t/hour |
Oil storage equipment
West district/Oura
naphtha tank | 12 units | 540,000KL |
---|---|---|
Petroleum semi-finished roducts/product tanks |
92 units | 945,000KL |
LPG tank | 11 units | 117,000 tons |
Other products, etc. tanks |
7 units | 66,000 tons |
East district
Tanks for raw materials, semi-finished products, finished products, etc. |
67 units | |
---|---|---|
(Inside) Spherical tank |
16 units |
Port/input/shipment equipment
Port/Input/Shipping Facilities (Western District/Oura)
sea berth | maximum | 149,999DWT | |
---|---|---|---|
large pier | 4 berths | maximum | 150,000DWT |
small pier | 11 berths | maximum | 7,450DWT |
Port facilities (east area)
pier | 5 berths | maximum | 4,000DWT |
---|
Land shipping equipment
Lorry loading dock | West district/ Oura |
15 loading docks |
---|---|---|
East district | 3 loading docks | |
drum filling machine | East district | 2 groups |

Your insights will be shown here
Indicator | Unit | Value | |||
---|---|---|---|---|---|
![]() |
Data Transparency | True | 2 | ||
![]() |
Modelling Status | True | 2 |
Site Settings
- Status
- A
- V
- P
Content provided by
Transaction | Name | Date |
---|---|---|
Modified by |
![]() |
4/23/2025 7:38 AM |
Added by |
![]() |
10/27/2023 6:18 AM |
Dashboard