Site
- Port Jerome
- Air Liquide
- Predominantly Chemicals Operations
- 76330
- Normandy
- 70, Av. du President Kennedy
-
Under a long term contract agreement, Air Liquide will take over and operate the 255 tons-per-day hydrogen production unit at the TotalEnergies platform in Normandy. Connecting the unit to Air Liquide’s hydrogen network will enable to optimize its performance and, ultimately, develop the world’s first low-carbon hydrogen network. The network already includes a hydrogen production facility in Port-Jérôme equipped with Air Liquide’s CryocapTM carbon capture solution since 2015. Air Liquide is considering adding a large-scale unit to produce renewable hydrogen via electrolysis.
Site Master Settings
- Status
- A
- V
- P
System Info
- Added by
-  Braun (Sysadmin), Uwe
- Added
- 2/14/2023 1:42 PM
No Services yet available.
Enquire in Solutions how we can help you.
Please create Assets first to manage the Mass Balance Processes