Site

-
- Vineo Antwerp
-
- Vioneo
- Site in a Project-Phase
- 2030
-
/ Antwerp - Norderlaan 79
-
Vioneo intends to establish its first production complex in Antwerp, Belgium – Europe’s largest integrated chemical cluster – with support from Vopak Belgium and the Port of Antwerp-Bruges. Expected to begin commercial operations in 2028, the first plant will be able to produce 300,000 tonnes of plastics annually, cutting at least 1.5 million tonnes of CO2 emissions annually.
Thanks to its strategic location at the heart of Europe, the initiative has the potential to revitalize the European chemicals sector and position Europe as a leader in defossilising the industry.
The LDPE plant will use a green methanol feedstock derived from biogenic CO₂, ensuring a fully fossil-free, traceable, and ISCC PLUS-certified product. Powered by renewable electricity, the facility will significantly reduce lifecycle emissions while delivering high-performance LDPE suitable for critical applications in healthcare, automotive, packaging, and consumer goods.
“This project is a landmark moment for the polymer industry. By combining green methanol with our high-pressure polyethylene technology, we’re enabling a truly fossil-free approach to plastics manufacturing. We look forward to working with Vioneo to deliver this first-of-its-kind facility,” said ECI Group’s Director for HPPE Technology, Chris Brock.
ECI Group’s proprietary technology offers a wide range of high-pressure polyethylene products, providing unrivalled operational efficiency, reliability, and flexibility. Building on ECI Group’s decades of experience within the polymer industry, their technology has been optimized to make use of modern materials, design techniques, standards, and industry best practices for construction, operation, and maintenance. In the four years since 2021, ECI Group has licensed over one million tonnes of annual capacity, all using ECI Group’s standardised design approach.
System Info
- Modified by
-
 Braun, Uwe
- Modified
- 9/4/2025 7:17 AM
- Added by
-
 Braun, Uwe
- Added
- 9/4/2025 7:16 AM

No Services yet available.
Enquire in Solutions how we can help you.
Site Settings
- Status
- A
- V
- P
Please create Assets first to manage the Mass Balance Processes