- KPI Petrochemical Project
-
- Kazakhstan Petrochemical Industries Inc. LLP
- Predominantly Chemicals Operations
- 060000
-
/ Atyrau - Atyrau-Dossor Highway, building 295
Propane supply
Capacity: 629,000 tonnes per year (10,500 railway cars per year)
Industrial gas production unit
Project is implemented by: Air Liquide Karabatan Tech Gases LLP
Consumption: KPI Inc. LLP:
- Nitrogen: 5000 nm3/h
- Dry compressed air: 4000 nm3/h
Gas Turbine Power Plant
Project is implemented by: Karabatan Utility Solutions LLP
Consumption: KPI Inc. LLP:
- Electric energy: 62 MW
Water conditioning and purification unit
Project is implemented by: Karabatan Utility Solutions LLP
Consumption KPI Inc.:
- Demineralised water: 360 m3/h
- Process water: 3 m3/h
- Demineralised water: 56,37 m3/h
- Purification of household sewage: 35 m3/h
- Treatment of oily and storm water: 22 m3/h
- Purification of chemically contaminated wastewater: 73 m3/h
Propane dehydrogenation unit
Propane processing: CATOFIN technology
Capacity: 503,000 tonnes per year
Propylene polymerization unit
Propylene processing: NOVOLEN technology
Capacity: 500,000 tonnes per year
Production distribution
Product packaging capacity: 1500-1800 tonnes per day
Packaging: bags (25 kg each), Big-bag (1 tonne), bulk
Your insights will be shown here
| Indicator | Unit | Value | |||
|---|---|---|---|---|---|
|
Data Transparency | True | 3 | ||
|
Modelling Status | True | 3 |