Asset
- N°2 Naphtha Cracker
- ZPC Zhoushan
- Zhejiang Petroleum & Chemicals Co., Ltd.
-
10th Mar 2021
But phase 1 has one 1.4 million mt/year ethylene unit while phase 2 plans to double the capacity with two ethylene units.
(Source)
12th Apr 2021
Chinese private-sector refiner and petrochemical producer Zhejiang Petrochemical (ZPC) fed naphtha into its 1.4mn t/yr No.2 ethylene cracker in east China's Zhejiang province on 11 April. ZPC expects to obtain on-specification ethylene and propylene production at the new naphtha-fed cracker in a week or two. This is ZPC's second naphtha-fed cracker, starting up 16 months after its first 1.4mn t/yr cracker came on line at the end of December 2019.
The No.2 cracker can produce 1.4mn t/yr of ethylene and 700,000 t/yr of propylene and has fully integrated downstream units, which include 450,000 t/yr of linear-low-density/high-density polyethylene (LLD/HDPE), 350,000 t/yr of HDPE, 100,000/800,000 t/yr of ethylene oxide (EO)/ethylene glycol (EG), 450,000 t/yr of polypropylene (PP), 260,000 t/yr of acrylonitrile and 200,000 t/yr of butadiene capacity. The downstream units are expected to start up gradually during May-June.
(Source)
Asset Info
- Category
- Processing
- Status
- A
- V
Technology
- Technology
- Technip Steam Cracking
- Licensor
- Technip Energies NV
Additional Info
- Utilization Planning
- Asset Level
- UoM
- Metric Ton
- Startup Date
- 04/2021
System Settings
- User
-  Kokel, Nicolas
- Modified
- 11/24/2024 6:07 PM
- Added
- 2/24/2023 8:58 AM
  Units Quick Access
Unit | D | Technology-Unit | Category |
---|---|---|---|
Default Unit |
|