Site
-
- La Mède Refinery
-
- TOTAL Energies S.E.
- Refining and Chemicals Operations
- 13220
-
Located in Châteauneuf-les-Martigues, near Marseille, France, the La Mède complex includes a biorefinery with a production capacity of 500,000 metric tons of renewable diesel per year, an AdBlue production plant, a logistics and storage hub, an industrial-scale training center, a solar farm, a production unit for recycled fuels and a test platform for the production of microalgae.
The La Mède complex now encompasses:
- A biorefinery with a capacity of 500,000 tonnes of biofuel per year.
- An 8-megawatt solar farm that can supply 13,000 people.
- A unit to produce 50,000 cubic meters per year of AdBlue®, an additive that reduces nitrogen oxide emissions from trucks.
- A logistics and storage hub with a capacity of 1.3 million cubic meters per year.
- A training center offering real facilities and able to host 2,500 learners a year.
The biorefinery can produce 500,000 tonnes of hydrotreated vegetable oil (HVO), a premium biofuel. La Mède will produce both biodiesel and biojet fuel for the aviation industry. It was specifically designed to process all types of oil. Its biofuels will be made:
- 60 to 70% from 100% sustainable vegetable oils (rapeseed, palm, sunflower, etc.).
- 30 to 40% from treated waste (animal fats, cooking oil, residues, etc.) to promote a circular economy.
As part of an agreement with the Government in May 2018, Total has pledged to process no more than 300,000 tonnes of palm oil per year — less than 50% of the total volume of raw materials needed — and at least 50,000 tonnes of French-grown rapeseed, creating another market for domestic agriculture.

No Services yet available.
Enquire in Solutions how we can help you.
Indicator | Unit | Value | |||
---|---|---|---|---|---|
![]() |
Renewable Feedstocks | True | 3 |
Site Settings
- Status
- A
- V
- P
- UoM
- Metric Ton
Content provided by
Transaction | Name | Date |
---|---|---|
Modified by |
![]() |
9/8/2025 4:48 PM |
Added by |
![]() |
6/29/2023 10:07 AM |
Please create Assets first to manage the Mass Balance Processes