Site
- ADU Reference without On-Stream Cleaning
- Comparative ADU with and without On-Stream Cleaning (OSC)
- Refining and Chemicals Operations
-
ADU nameplate capacity is 100,000 BPD of Brent Crude Oil. The ADU runs 5 years 365/24/7 excepted for the last year, at the end of which a 1-month turn-around is done to clean the plant. Furnace Inlet Temperature (FIT) at Start-of-Run (SOR) until End-of-Run by Year 5 is according to: SOR - Year 1: 240°C | Year 2: 233°C | Year 3: 226°C | Year 4: 219°C | Year 5: 212°C EOR - Year 5: 206°C Output capacity at end of each year decreases according to: Year 1: 98% | Year 2: 95% | Year 3: 91% | Year 4: 86% | Year 5: 80% The yield is calculated as the FIVE-YEAR AVERAGE (including one month turn-around at EOR) to be 92.3%. Thus the 5-year average daily Brent Crude consumption is 92,300 BPD instead of 100,000 BPD. Fuel oil consumption at Start-of-Run (SOR) until End-of-Run by Year 5 is according to: SOR - Year 1: 64,000 mt | Year 2: 66,949 mt | Year 3: 68,718 mt | Year 4: 70,487 mt | Year 5: 72,256 mt EOR - Year 5: 73,878 mt Fuel Oil consumption increases due to Equipment fouling.
Site Master Settings
- Status
- L
- V
- P
- Site-Manager
- Kokel, Nicolas
- UoM
- Barrel of oil equivalent (BOE)
System Info
- Modified by
-  Braun, Uwe
- Modified
- 7/8/2024 11:48 AM
- Added by
-  Braun (Sysadmin), Uwe
- Added
- 6/8/2022 2:48 PM
No Services yet available.
Enquire in Solutions how we can help you.
Indicator | Unit | Value | |||
---|---|---|---|---|---|
Modelling Status | True | 3 |
Featured Function
Mass Balance Visualization | Visualize the Production Flow with our Mass Balance Charting Tool. |
Please create Assets first to manage the Mass Balance Processes