Asset

-
- Methanol Plant
-
- Salalah Methanol
-
- Salalah Methanol Company LLC
-
The basic process design for the Methanol Plant was supplied by Jacobs Engineering, UK. The Methanol Plant uses Johnson Matthey's LP (Low Pressure) process with a Methanol Casale ARC Converter. The detailed engineering, procurement, construction and commissioning of the Methanol Plant was carried out by GS E&C, South Korea on a lump-sum turnkey contract basis and the plant was commissioned in May 2010.
Asset Info
- Category
- Processing
- Status
- A
- V

Scenario
- Scenario
- System / Public
Additional Info
- Utilization Planning
- Asset Level
- UoM
- Barrels
System Settings
- User
-
 Braun (Sysadmin), Uwe
- Added
- 2/15/2023 1:06 PM

  Units
Unit | D |
![]() |
Category |
---|---|---|---|
Default Unit |
|